Menu
Home
Contact
Services
Rates
Estimates
Galleries
Woodwork & Furniture Restoration
Musical Instruments
Historic Architecture
Wood Graining
Commercial Projects
Elevators
Venetian Plaster
Automotive Refinishing
Gold & Silver Leafing
Museum Quality Faux Finishing
Murals & Sky Ceilings
Pennington Finishes
Successful Surface Solutions
Home
Contact
Services
Rates
Estimates
Galleries
Woodwork & Furniture Restoration
Musical Instruments
Historic Architecture
Wood Graining
Commercial Projects
Elevators
Venetian Plaster
Automotive Refinishing
Gold & Silver Leafing
Museum Quality Faux Finishing
Murals & Sky Ceilings
Historic Architecture
5th. Ave Theatre balcony wall damage 2022
5th. Ave Theatre balcony wall, stage two
5th. Ave.Theatre balcony wall stage three
5th. Ave. Theatre balcony wall in primer 2022
Finished color matched top coat, comp.2022
Balcony facing west, project completed 2022
Wood railing base with load out damage 2022
Auto body filler replicating profile, 5AT 2022
Base color for mahogany woodgrain 5AT 2022
Graining comp. just prior to satin sealer 2022
View looking West, 5th. Ave. Theatre 2022
West corner, balcony wall repair comp. 2022
Typical damage prior to refinishing, 5AT 2022
800 ft. of black railing restoration, 5AT 2022
Railing restoration in progress, 5AT 2022
Restored, antique walnut railing, 5AT 2022
Railing detail, 5th. Ave. project comp. 2022
West wall auditorium panel restoration, 2022
Access panel opening recreation, 5AT 2022
Filling & floating surrounding area, 5AT 2022
Completed square repaired, 5AT comp.2022
Sloping floor made access challenging, 2022
Typical delamination after cleaning 5AT 2022
Structural ceiling deterioration, 5AT 2022
In-house prior color match, 5AT comp. 2022
Original color scheme has returned, 5AT 2022
Restored to original specifications 5AT 2022
Vertical view NE column restoration, 5AT 2022
Repair filler stage, NE column 5AT 2022
Restoration complete, NE column 5AT 2022
Restoration detail typical column, 5AT 2022
West wall facing North, 5AT completed 2022
Restored and ready for re-opening, 5AT 2022
NW exit bas-relief restoration, 5AT comp.2022
Sanding & fill step, SE balcony wall, 5AT 2022
Localized repair completed, 5AT 2008
SE corner wall H2o damage, 5AT 2008
Restored paint, gilding and woodgraining, 2008
Major H2o damage portico ceiling, comp.2009
Typical damaged substrate & delamanation
Sanded & dusted, ready for primer, comp.2009
Stain block primer stage comp. 5AT 2009
First of many colors, portico ceiling 5AT 2009
Third and fourth stages, 5AT completed 2009
Custom laser cut dragon stencil, 5AT 2009
Application of gold metallic via stencil, 5AT 2009
Detail of restored coffers, 5AT completed 2009
24 coffers completed in 19 days, 5AT 2009
Stucco wax resist restoration, comp.1995
Damage to stucco, and previous repair, 1995
Stucco repair to breezeway wall, started 1994
Three color wax resist process, completed 1995
Detail breezeway wall, completed in 1995
Restored door frame, 3 color wax resist, 1995
Meridian Studios, Santa Barbara CA 1995
Los Angeles Biltmore, Rendevous Court
24 Coffers Replaced, House Painter's Efforts
L.A. Biltmore Galleria, Earthquake Repair
Seam Detail Of Ceiling Replacement 1994
Detail Of Octagonal Coffer Completed 1994
24 K. Gold Leaf Cherubs Over Glazed Field
Painted, Copper & Bronze Powder Completed
Restoration Complete, Like It Was When New
L.A. Biltmore Hotel Galleria Completed
L.A. Biltmore Crystal Ballroom Fallen Crown
Biltmore Hotel Mould Making & Replication
Anchoring Framework Installed From Inside
2, 10' Sections Of Crown Moulding Removed
First New FRG Crown Moulding Installed
2nd FRG Crown In Place, Ready For Painting
Painting & Gold Leafing Process Underway
Right Side Aged & Distressed To Match Existing
Left Side Aged & Distressed, Completed 1999
L.A. Biltmore Hotel Finished Restoration 1999
Crystal Ballroom Crown Moulding Back In Business
St. Andrew's Church, Northridge Earthquake Damage
Broken Piece Attached, Filled & Ready To Faux Paint
Final Result Faux Painted & Clear Coated
Westin Kauai Lobby Column Repair, Before
Water Damage De-lamination Westin Kauai
Westin Kauai Hotel, Repair Of Concrete Filling Damage
Patched And Spot Painted, Completed 1987
24 Columns Repaired & Repainted In 28 Days
Detail Of Repair Area
L.A. Biltmore, "West Wing" Film Crew Smoke Damage
Detail Of Cleaning Prior To Restoration
Final Result Matching Previous Repair Work
Detail, Tiffany Room Ceiling, L.A. Biltmore Hotel
Scaffolding Emerald Room, Biltmore Hotel 1995
L.A. Biltmore S. Galleria Ceiling Degradation Detail
Peeling Paint Removed, Ready For Filling & Painting
Restored Ceiling, South Galleria Completed 1994
Badly Weathered Exterior Balcony Detail
Finished Balcony Detail in Faux Limestone
Faux Limestone Finish In Early Morning Shadow
Pool House Restoration In Progress 2018
Exterior Pool House Trim Completion
Finished Faux Limestone Trim 2018
Calcium Deposits Before Removal, Completed 2019
Removal Of Calcium Deposits, Finished As Requested